DC06 UPS Maintenance
Scheduled Maintenance Report for Juice Broadband
Completed
The maintenance has been completed and UPS-B returned to service.
Posted Dec 12, 2023 - 14:11 GMT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 12, 2023 - 13:00 GMT
Scheduled
The Riello UPS-B powering B-Feed to racks at DC06 in Poole is scheduled to be inspected and serviced on the 12th December by specialist UPS contractors.

During the works it may be required for the B-feed to bypass the UPS and be running from the mains , with the associated loss of UPS resilience for this feed. If this is required and in the event of a power cut the B-feed will still be backed by generator but will lose power during the transition.

The A-Feed will remain backed-up by UPS-A and generator as usual, however there will be loss of resilience to the B-Feed due to these necessary works.

As all racks are dual fed with 'A' and 'B' feeds no disruption is anticipated.
Posted Nov 23, 2023 - 11:37 GMT
This scheduled maintenance affected: Core IP Network.