DC04 / City Lifeline Planned power test

Scheduled for Nov 25, 11:00 - 14:00 GMT

Scheduled

Please see below notice from the supplier of our DC04 COLO space. This is an 'at risk' notice only, service should be unaffected.

Our Supplier Stellanor will be performing a Comprehensive Utility Failure Test at Data Centres, involving the controlled disconnection of the incoming utility power, designed to simulate a loss of mains power to the site.

The failure test will be performed at different data centres as per the below schedule,

DC04 Shoreditch / City Lifeline - 25th Nov, 11:00 to 25th Nov, 13:00

The test will verify the operation and performance of the site's emergency backup power systems and automatic transfer sequences.

The Data Centre load will transfer from the utility supply to the generator systems and remain fully supported by generators for the duration of the test.

Customer cabinet power will remain protected by the site's Uninterruptible Power Supply (UPS) infrastructure for the duration of the test and no interruption to service is expected.

Once testing is complete, the load will be transferred back to the utility supply in a controlled manner and normal operations restored. System redundancy will remain unaffected throughout.
Posted Nov 19, 2026 - 14:57 GMT
This scheduled maintenance affects: Core IP Network.